Focused arrival windows
Useful updates and clear arrival timing.
Kitchen Renovation Bonita Springs FL means tearing out the old and building back better: new cabinets, quartz counters, corrected wiring, and flooring that survives our climate. We handle full kitchen remodels for homeowners in Lee County, from 1980s condos off Bonita Beach Road to family homes in Spanish Wells. Whether you want a quick refresh or a complete gut, we walk you through every step and keep the job moving.
Useful updates and clear arrival timing.
Review the approach and price before deciding.
Equipped vehicles and respectful cleanup.
Neighbors serving neighbors with follow-through.
Our standard renovation covers demolition through final walkthrough, with permits and inspections handled. We tell you upfront what is in the scope and what would be an add-on, like moving a gas line or adding a window, so there are no surprises mid-job.
We remove old cabinets, counters, flooring, and drywall as needed, then haul everything away. Dust barriers and floor protection go up first. Most kitchens demo in two to three days.
New dedicated circuits, GFCI receptacles, under-cabinet lighting, and updated supply and drain lines. We correct outdated plumbing fixtures and wiring while the walls are open, which is the only cheap time to do it.
We set and level cabinets, then template for quartz or granite countertops. Sink cutouts, edge profiles, and backsplash height all get confirmed before fabrication so the finished counter fits the room.
We level the subfloor, install underlayment, and set ceramic tile or vinyl plank flooring. Backsplash goes in after counters, with grout sealed against moisture. Both are chosen to handle coastal humidity.
Stainless steel appliances get set, leveled, and connected. We install trim, caulk joints, and test every outlet, light, and fixture before the final walkthrough with you.
Share what is happening and receive a clear next step from the local team.
A kitchen renovation is more than swapping cabinets and paint. It is a sequenced construction project: demolition, framing corrections, electrical and plumbing rough-in, drywall, cabinet setting, countertop templating, tile work, and final trim. In Bonita Springs, that sequence has to account for humidity, salt air, and older building stock. We pull permits, coordinate trades, and keep the schedule tight so your kitchen is not torn apart for months. Every phase gets inspected before we close it up.
Most of our Bonita Springs kitchen renovation services start because something failed: water damage behind cabinets, outdated electrical wiring that cannot handle a modern appliance load, or poor kitchen ventilation that leaves grease on every surface. Others start because a family simply outgrew the layout. If you are searching for a kitchen remodel near me Bonita Springs, we are local, we answer the phone, and we can usually walk your space within a few days.

We come out, measure the room, check the panel, look under the sink, and photograph everything. You get a written scope with line-item pricing, not a lump sum. Most walkthroughs take 45 to 60 minutes.
You pick cabinet lines like KraftMaid or Merillat, countertop material, tile, and flooring. We bring samples and tell you honestly which finishes hold up in Florida humidity. This phase usually runs one to two weeks.
We protect the rest of the house, tear out the old kitchen, and haul it away. Then electrical and plumbing rough-in happens, followed by inspection. Expect three to five working days for a standard kitchen.
Drywall, paint, cabinet setting, countertop template and install, tile backsplash, and flooring. This is the longest stretch, typically two to three weeks depending on material lead times.
We install trim, reconnect appliances, test every outlet and fixture, and walk the room with you. Anything on the punch list gets handled before we call the job done. Final walkthrough takes about an hour.

Sets a true datum line for cabinet runs and checks subfloor flatness before flooring goes down. On an uneven slab, this is what keeps uppers and lowers aligned.
Locates framing for cabinet blocking and safely removes old cabinets, counters, and trim during demo without damaging surrounding walls.
Cuts ceramic tile and backsplash pieces cleanly, then seals joints and edges with moisture-resistant caulk rated for kitchen and bath use.
Cuts plywood, butcher block, and cabinet panels to fit. The jigsaw handles sink cutouts and outlet openings where a circular saw cannot reach.
Drives cabinet screws and sets trim and blocking fast. The nail gun speeds up trim work and keeps fastener heads consistent across the room.
Feathers drywall joints and preps cabinet frames and trim for paint. On refacing jobs, it is what makes the new veneer sit flat against the old boxes.
We schedule and sequence the job the way NARI-trained remodelers do: rough-in inspected before drywall, counters templated after cabinets are set, and a written punch list closed out before final payment.
In pre-1978 homes, we contain the work area, control dust, and follow lead-safe handling rules during demo and sanding. It protects your family and keeps the job compliant.
Electrical, plumbing, and structural changes are permitted and inspected through Lee County. We build to Florida code so the work holds up at resale and passes any future inspection.
We specify quartz or sealed granite over porous stone, ceramic tile or vinyl plank over laminate, and cabinet boxes with moisture barriers. Coastal air punishes the wrong choices fast.

We gut to the studs, correct the wiring, replace the plumbing fixtures, and rebuild with shaker cabinets, quartz counters, and a proper outlet layout. Permits handled through Lee County. A kitchen that passes inspection, handles a modern appliance load, and adds real resale value instead of a list of deferred problems.
We reface the existing cabinet boxes, install new doors and drawer fronts, set quartz counters, and add a subway tile backsplash. Work stays inside the unit and respects building hours. A finished kitchen in about nine days with minimal noise and no structural work, at roughly half the cost of full replacement.
Our NKBA Certified Kitchen Designer reworks the plan, we remove a non-bearing wall, add a beam, and build an island with seating and drawers on both sides. Thirty percent more counter space, a real prep zone, and a room that flows into the dining area instead of blocking it.
Bonita Springs kitchens deal with two things most markets do not: salt air and year-round humidity. Both attack cheap materials. Particle board cabinet boxes swell at the edges, laminate flooring cups, and unsealed grout turns dark within a season. We specify quartz countertops, ceramic tile, and vinyl plank flooring for that reason, and we seal every grout line. The other local factor is building age. A lot of homes off Old 41 and along Bonita Beach Road were built in the 1970s and 1980s, which means aluminum wiring, undersized panels, and cast iron drains. When we open a wall, we plan for what we might find and price the correction honestly. If you need an affordable kitchen renovation Bonita Springs FL homeowners can actually budget for, we will tell you which upgrades matter and which ones you can skip. Hurricane season also shapes scheduling. We aim to have exterior-adjacent work and material deliveries done before storm season peaks, and we keep jobs moving so a kitchen is not sitting open when a system rolls through.
Many homes here date to the 1980s with original cabinet runs and two-outlet counters. Full renovations usually include an electrical panel upgrade.
Condo and villa kitchens with tight footprints. Refacing and quartz counters deliver the biggest visual change without moving plumbing.
Salt air exposure is highest here. We push stainless steel appliances and sealed stone to resist corrosion and pitting.
Older ranches with cast iron drains and aluminum wiring. We plan for rough-in corrections and permit the work through Lee County.
Unsealed wood, cheap laminate, and porous stone fail fast. We specify moisture-resistant materials and seal grout and stone edges to extend the life of the finish.
Aluminum wiring, undersized panels, and cast iron drains are common. We budget for corrections during rough-in so the renovation does not stall mid-job.
Material deliveries and exterior work get front-loaded before storm season peaks, so an open kitchen is not exposed when weather moves through.
Original 1985 cabinets with water-swollen boxes under the sink, a cracked laminate counter, two counter outlets, and a range hood that recirculated grease back into the room.
New shaker cabinets, quartz counters, six countertop receptacles on dedicated circuits, a ducted hood venting outside, and ceramic tile flooring. Six weeks start to finish, first-pass inspection.
Maintenance: Wipe quartz with mild soap, reseal grout annually, and keep the hood filter clean. The cabinet boxes have moisture barriers, so occasional splashes are not a problem.
Solid but dated oak cabinet boxes with worn doors, a scratched laminate counter, and a backsplash that had yellowed from years of cooking grease and humidity.
Refaced cabinets with new shaker doors and drawer fronts, quartz counters, subway tile backsplash, and vinyl plank flooring. Nine working days, no structural work, building hours respected.
Maintenance: Wipe doors with a damp cloth, avoid abrasive cleaners on the veneer, and reseal the backsplash grout once a year to keep it bright.
A closed-off galley kitchen with a wall blocking the dining room, no island, and a fridge that jammed the main walkway every time the door opened.
Non-bearing wall removed with a new beam, island added with seating and drawers on both sides, and the fridge relocated. About 30 percent more counter space and a room that flows into dining.
Maintenance: Check the beam and trim paint yearly, keep the island drawers aligned by not overloading them, and clean the new flooring with a pH-neutral cleaner.
Most renovations start with a problem the homeowner already noticed. Here are the ones we see most in Bonita Springs kitchens.
Soft cabinet boxes, warped flooring, and mold growth under sink that spreads into the wall cavity. Left alone, it rots framing and shows up as a smell you cannot place. We open the wall, find the source, replace rotted framing and drywall, and rebuild with moisture-resistant materials. If mold is present, we treat it before closing anything up so the new kitchen does not inherit the old problem.
Tripped breakers, warm outlets, and a real fire risk when a modern appliance pulls more current than the old circuit was built for. It also fails inspection at resale. We run dedicated circuits for the range, microwave, dishwasher, and countertop receptacles, add GFCI protection, and bring the panel up to code. The inspector signs off, and you stop resetting breakers every time you cook.
Cooking grease coats cabinets, walls, and ceilings, and humidity stays trapped in the room. Over time it feeds mold and dulls every finish you paid for. We size and install a properly ducted range hood that vents outside, not a recirculating unit that just moves air around. Duct routing gets planned during rough-in so it exits cleanly through the wall or roof.
Tile cracks along grout lines and vinyl planks pop at the seams within a year. The floor looks fine on install day and fails by the next season. We check the subfloor with a laser level before anything goes down, then level and prep it. It adds a day to the schedule and saves the entire flooring investment.
$12,000 - $75,000 depending on scope
Typical 2026 pricing in this area runs $28,000 to $75,000 for a full renovation, and $12,000 to $20,000 for a cosmetic remodel with refacing and new counters. The spread comes down to cabinet line, countertop material, whether we move plumbing or electrical, and what we find behind the walls. We give you line-item pricing after the walkthrough so you can see exactly where the money goes and cut scope if you need to. No hidden change orders, no surprise add-ons mid-job.
The number looks large until you price the alternative: patching a failing kitchen every two years, living with tripped breakers, and taking a hit at resale for unpermitted work. A renovation done to Florida code with moisture-resistant materials is a one-time cost that holds its value.
Stock cabinets from a big-box line cost far less than semi-custom KraftMaid or Merillat. Cabinet count and whether you add an island or pantry drive this number more than any other single line item.
Quartz and granite sit in a similar range, but edge profiles, sink cutouts, and slab size affect the final price. A large island may need a bigger slab, which raises material cost.
Moving the sink, range, or fridge means new plumbing and electrical runs. Removing a wall may require a beam and engineering. Each change adds labor and permit scope.
Older Bonita Springs homes often need a panel upgrade, new circuits, or replacement of cast iron drains. We price these honestly after opening the walls rather than guessing upfront.
Ceramic tile and vinyl plank land in different price bands, and square footage matters. Backsplash height, tile pattern, and whether we level the subfloor all shift the total.

We are a Bonita Springs kitchen renovation contractor that works this market every week, not a crew driving down from out of county. Our team includes an NKBA Certified Kitchen Designer who lays out the space and a Florida Certified General Contractor who pulls the permits and answers to the inspector. We hold EPA Lead-Safe Certified status, which matters in pre-1978 homes where sanding old paint can release lead dust. Every job is run by someone who has set cabinets on an uneven slab and knows what it takes to make them level.

Our 1985 kitchen had water damage behind the sink cabinets and wiring that scared two other contractors off. This crew pulled the permit, replaced the rotted framing, ran new circuits, and set quartz counters. Six weeks start to finish. The inspector signed off first pass, and the drawers still glide perfectly a year later.
We wanted the wall between the kitchen and dining room gone. They checked whether it was load-bearing, added a beam, and handled the whole thing with the county. New layout gave us an island and about 30 percent more counter space. They kept the house livable the entire time and swept up every night.
Refacing was the right call for our condo and they told us so instead of upselling a full gut. New shaker doors, quartz counters, subway tile backsplash, and vinyl plank flooring. Done in nine days. The grout lines are dead straight and the cabinet doors all line up, which was not true of the original install.
A mid-range full renovation in Bonita Springs runs about $28,000 to $75,000 in 2026, depending on cabinet line, countertop material, and whether we are moving plumbing or electrical. A cosmetic refresh with refaced cabinets and new counters can land closer to $12,000 to $20,000. Layout changes and structural work push the number up.
A remodel updates surfaces and fixtures within the existing footprint. A renovation changes the bones: walls, plumbing runs, electrical circuits, and layout. If you are moving the sink or knocking out a wall, that is a renovation. If you are replacing cabinets and counters in the same spots, that is a remodel.
Look for a Florida Certified General Contractor who pulls permits, carries insurance, and can show you completed kitchens in Lee County. Ask to see a current jobsite and talk to a past client. We will give you both, plus our license and insurance certificates, before you sign anything.
A standard full renovation takes six to ten weeks from demo to final walkthrough. Cabinet and countertop lead times drive most of that. Cosmetic remodels with refacing can finish in two to three weeks. We give you a written schedule at the start and update it weekly.
Not seeing your question? Our local team can help you understand urgency, scheduling and what to expect.
Ask the local teamCall or email us and we will schedule a walkthrough at your Bonita Springs kitchen. Most estimates go out within two business days of the visit. We answer the phone during business hours and return after-hours messages first thing the next morning.